Methodology
In our organization we follow a typical method - process to deliver the project with high quality. Irrespective of the software platform/ domain we follow a standard life cycle for executing and delivering the projects
 
The software life cycle flow chart and the details are as follows:
 
 
Requirement Analysis
 
The requirement of the software in terms of
Platform
System configuration
Functionalities
Security
Data Management
Hardware requirements.
are gathered and documented which will be sent to the client for approval.
 
Architectural Design Phase
 
In this phase the several components required for the software are analyzed and design (database, templates, HTML pages) for the same is documented and sent to the client for approval.
 
Detailed Design Phase
 
In this Phase we concentrate on designing the interrelation between each and every component and define the work that are needed to be done on the each component to suite the final requirement of the software. The required info is detailed and documented. A detailed module wise time line with the target date to complete the project are estimated in this phase and sent to client's approval.
 
Coding and Unit testing Phase
 
In this phase both coding of the components and testing of the developed components are implemented. Both the tasks should comply with Detailed design document.
 
Software Integration
 
In any software development life cycle the modules designed and developed by different developers are integrated in this phase and quality test for the each functionality is dually accomplished to ensure the purpose of the software.
 
System Integration
 
The software is tested wholly as a product/ web site.
 
Acceptance Testing
 
In the acceptance testing all the testing modes are implied on the software to check for the compatibility, functionality and load are tested completely to deliver the product to go live.
 
Maintenance
 
In the Maintenance phase we would fix the bugs if any (when the product is live) OR add/ modify the functionalities for enhancing the software to suite the client's requirement.
 
Project Review
 
The project manager, coder and the client review the project weekly/monthly at different levels to maintain the flow in the project and daily updates also are delivered to the client depending upon the status/flow of the project in specific cases.
 
S.No Review point Review line Contents to be discussed Review panel members Remarks
1 Requirement Analysis Phase Before preparing the doc on the requirement Analysis The purpose of the software/domain/platform, time line is explained to the Project Manager and System Analyst Client, Project Manager, System Analyst  
2 Requirement Analysis Phase After Preparing the Requirement analysis (Functional specification) document To approve the document and to discuss if any modifications are to be done to the document Client, System Analyst and the Project Manager  
3 Architectural design Phase After preparing the Architectural document To discuss upon the document prepared. Project Manager, System Analyst, coder  
4 Detailed Design After Preparing the Detailed Design Document To discuss and approve the functionalities, database design, ERP diagram, relation between all other components and the time line for the project. Client, Project Manager, System Analyst and coder  
5 Coding and Unit testing Phase. After completion of coding and testing To discuss and approve the project to progress to the next phase or to modify any features if required. Project Manager, Coder, Tester  
6 Software Integration Phase After Completion of the Software integration Once the software is integrated with all the modules the project is reviewed/ approved for the next phase Client and Project Manager  
7 System Integration After System Integration phase Checked finally before going live Client and the Project Managers  
 
 